Cleaver Road Bridge

Share Cleaver Road Bridge on Facebook Share Cleaver Road Bridge on Twitter Share Cleaver Road Bridge on Linkedin Email Cleaver Road Bridge link

Scroll down to see the news feed for updates and information, discover ways to share your feedback, view FAQs, and more.


The Cleaver Road Bridge, located over Whitemans Creek between Colborne Street West and Robinson Road, was closed in July 2023 after a structural inspection, as part of the County’s Bridge Inspection Program, found it was no longer safe for vehicles. After further study, the County of Brant is now exploring options for the future of the bridge - and we want your feedback.

Why this is happening

The bridge was closed for safety reasons after it failed a required inspection. As part of the County’s Transportation Master Plan, Cleaver Road Bridge was also identified as a structure that may need to be closed, repaired, or changed.

Options being considered

We are studying six possible options:

OptionsDetails
Vehicular Rehabilitation- rehabilitate the existing bridge for vehicular traffic
  • Estimated construction cost of $2.8M
  • Estimated lifespan of 15 years (+/-5)
Vehicular Replacement - build a new bridge for vehicles
  • Estimated $3.5M - $4.0M to remove and replace bridge with no load limit with a contemporary or replica structure.
  • Estimated lifespan of about 75 years (+/-25)
Pedestrian Conversion - convert the existing structure for walking and cycling only
  • Estimated $500k - $900k to rehabilitate bridge for adaptive pedestrian use depending on level of service desired
  • Estimated lifespan of about 10 years (+/-5)
Pedestrian Replacement - build a new pedestrian bridge
  • Estimated construction cost of $650k (maintain span and elevation)
  • Estimated lifespan of about 50 years (+/- 15)
Permanent Retirement and Removal - remove the bridge permanently
  • Bridge would be fully documented in accordance with HIA prior to removal
  • Road would be permanently closed at the site, with creek embankments would be restored to pre-existing natural condition
  • Estimated construction cost of $250k
  • Lifespan comparison: permanent
Do Nothing
  • The bridge remains closed


Your feedback matters

By completing the survey, available May 12, or by attending the in-person Public Information Meeting, you can share your input to help us better understand what solution residents would like to see. Your input is valuable and will be carefully considered. At the same time, it’s important to remember that decisions must balance public feedback with other important factors like long-term impacts, environmental needs, legal requirements, financial considerations, and the needs of the entire community.

The County’s goal is always to make the most informed and responsible decisions by looking at all of these aspects together. We are committed to creating the greatest benefits, minimizing negative impacts, promoting equity, and addressing the many needs of our growing community.

Next steps

After gathering feedback, County staff will review all comments and prepare a recommendation based on study findings and community feedback for Council’s consideration.

FAQs

We have included a list of frequently asked questions to help answer some questions you may have.

Stay Informed

Subscribe for updates and be the first to learn more information about this project. Add your email to the Stay Informed box on this page and click.

Scroll down to see the news feed for updates and information, discover ways to share your feedback, view FAQs, and more.


The Cleaver Road Bridge, located over Whitemans Creek between Colborne Street West and Robinson Road, was closed in July 2023 after a structural inspection, as part of the County’s Bridge Inspection Program, found it was no longer safe for vehicles. After further study, the County of Brant is now exploring options for the future of the bridge - and we want your feedback.

Why this is happening

The bridge was closed for safety reasons after it failed a required inspection. As part of the County’s Transportation Master Plan, Cleaver Road Bridge was also identified as a structure that may need to be closed, repaired, or changed.

Options being considered

We are studying six possible options:

OptionsDetails
Vehicular Rehabilitation- rehabilitate the existing bridge for vehicular traffic
  • Estimated construction cost of $2.8M
  • Estimated lifespan of 15 years (+/-5)
Vehicular Replacement - build a new bridge for vehicles
  • Estimated $3.5M - $4.0M to remove and replace bridge with no load limit with a contemporary or replica structure.
  • Estimated lifespan of about 75 years (+/-25)
Pedestrian Conversion - convert the existing structure for walking and cycling only
  • Estimated $500k - $900k to rehabilitate bridge for adaptive pedestrian use depending on level of service desired
  • Estimated lifespan of about 10 years (+/-5)
Pedestrian Replacement - build a new pedestrian bridge
  • Estimated construction cost of $650k (maintain span and elevation)
  • Estimated lifespan of about 50 years (+/- 15)
Permanent Retirement and Removal - remove the bridge permanently
  • Bridge would be fully documented in accordance with HIA prior to removal
  • Road would be permanently closed at the site, with creek embankments would be restored to pre-existing natural condition
  • Estimated construction cost of $250k
  • Lifespan comparison: permanent
Do Nothing
  • The bridge remains closed


Your feedback matters

By completing the survey, available May 12, or by attending the in-person Public Information Meeting, you can share your input to help us better understand what solution residents would like to see. Your input is valuable and will be carefully considered. At the same time, it’s important to remember that decisions must balance public feedback with other important factors like long-term impacts, environmental needs, legal requirements, financial considerations, and the needs of the entire community.

The County’s goal is always to make the most informed and responsible decisions by looking at all of these aspects together. We are committed to creating the greatest benefits, minimizing negative impacts, promoting equity, and addressing the many needs of our growing community.

Next steps

After gathering feedback, County staff will review all comments and prepare a recommendation based on study findings and community feedback for Council’s consideration.

FAQs

We have included a list of frequently asked questions to help answer some questions you may have.

Stay Informed

Subscribe for updates and be the first to learn more information about this project. Add your email to the Stay Informed box on this page and click.

  • The survey is now closed. Thank you for participating!

    Your feedback is valuable and will be considered alongside other factors such as environmental impact, legal requirements, financial considerations, and community needs.

    County of Brant Staff aim to maintain a respectful and constructive dialogue with the public through all forms of communication. We understand and appreciate that people will have differing opinions and concerns, and welcome all feedback, in a respectful and constructive manner.