FAQs
What is the proposed budget for this potential project?
An initial approved budget of $250,000 was established for Phase 1, Preliminary Design Concepts and Engineering. The proposed 2025 budget will include $300,000 for Phase 2 Studies, Detailed Design and Engineering. A long-range estimate for the Community Centre and/or Park is $4,000,000.