• Please use tab to navigate through video controls.
  • Upon entering the player press space bar to reach the play button

Cedar Street Environmental Assessment Town Hall

Video capture of the Virtual Meeting which was held on Thursday, November 12 at 6:00 pm.


Overview
Overview
The Cedar Street project will look at the storm water management plan for Cedar Street, road improvements, water and sanitary servicing and improvements to benefit cyclists and pedestrians. A Municipal Class Environmental Assessment is required for a new storm water management system. This means we need to follow a regulated process and your input is very important.
Stormwater Management Options
Stormwater Management Options
This video will discuss the stormwater management options for the Cedar Street Reconstruction Project. Cedar Street does not have a storm sewer network to handle a 5-year storm event, or overland flow routes to manage a more significant storm event. Currently, stormwater runoff ponds and generally creates a south drainage area and north drainage area. Ponded water eventually infiltrates into the ground. The objective of this study will be to identify the most preferred alternative that is technically sound, cost-effective, socially acceptable and environmentally responsible.
Other Improvements
Other Improvements
In addition to the storm water management plan, there are other improvements we would like to make to Cedar Street in Paris.
Cedar Street Environmental Assessment Town Hall
Cedar Street Environmental Assessment Town Hall
Video capture of the Virtual Meeting which was held on Thursday, November 12 at 6:00 pm.