What's next: A refined concept with two shade options
Based on your input, we created a refined concept that builds on what you liked about Concept 2 and incorporates the suggestions we heard.
Updates include:
- The shade structure has been moved to the rear of the site.
- The pedestrian kiosk is now closer to the sidewalk.
- Greenspace has been prioritized, with accessible pathways maintained.
- The location of the mural/public art has been adjusted to avoid blocking adjacent signage.
- Opportunities for a small play feature have been identified.
We also heard a desire for an alternative shade structure design. So we’ve created two versions of the refined concept. Option A and Option B, each with a different shade structure to choose from.
| View Concept A | View Concept B |
Have Your Say: Take the Follow-Up Survey
We’d love your input one more time!
Take a look at the refined concepts then vote for your preferred shade structure design and other details in our short follow-up survey.
The survey closes Friday, August 8, 2025.
Once we’ve gathered your feedback on the refined concept, the project will move into the detailed design phase, bringing us one step closer to a refreshed and welcoming space in the heart of Burford.
Construction is planned to roll out in two phases:
- Phase 1 will include the parking lot and hardscape elements (like walkways and paved areas), with work expected to begin in Fall 2025.
- Phase 2 will focus on the finishing touches, including site furnishings and plantings. Depending on how Phase 1 progresses and the weather, this phase will likely take place in late Fall 2025 or early Spring 2026.
Your voice is helping shape a community space that reflects what matters most to Burford. Thank you for being part of the process!

Thank you for your contribution!